Civil Contracting

Underground utility and civil contractor in Saudi Arabia

Trenching, ducting and underground civils — the substrate every system depends on.

Underground civil works are the substrate every other utility depends on. Metalinq delivers them with the survey, permitting and reinstatement discipline that lets electrical, water and fiber installations go in on time and stay protected.

Because the same group delivers the utilities that run through the corridors, civil works can be planned around the systems they carry rather than as a separate package.

Civil Contracting

Scope of work

01

Trenching, ducting and underground civils

Excavation, duct banks, chambers and backfill for utility networks.

02

Cable and pipeline corridors

Shared corridors for power cables, fiber and pipelines, planned for future access.

03

Site preparation and reinstatement

Enabling works, and reinstatement of roads, pavements and landscaping after installation.

04

Permitting support and authority interfaces

Preparation of permit submissions and coordination with the authorities and utility owners involved.

05

Surveys and geotechnical services

Topographic and utility surveys, GIS records and ground investigation inputs.

06

Tunneling and trenchless installation

Horizontal directional drilling and other trenchless methods where open-cut is impractical.

Typical engagements

  • Utility corridors for new developments carrying power, water and fiber
  • Duct-bank and chamber works for electrical and telecom networks
  • Trenchless crossings under roads and existing services
  • Reinstatement after utility installation in built-up areas
  • Survey and permitting packages ahead of construction

What to include in your inquiry

A complete brief lets our engineers price and plan accurately and reply faster. Where you have them, include:

  • Project location, owner/consultant, and tender, RFQ or RFP reference
  • Route lengths, trench and duct specifications, and chamber quantities
  • Ground conditions or geotechnical reports, and existing utility records
  • Crossings that may need trenchless methods, with approximate lengths
  • Permitting status and which authorities or utility owners are involved
  • Reinstatement requirements, working-hour limits and schedule
Submit your project brief
Request a Quote

Submit your project brief

For procurement, partnerships, RFQs and technical RFPs. The team responds within one business day.

We use these details only to respond to your inquiry.